Install guide
60 minutes at home, 1 h at a workshop (about $95 in labour at US independent rates). Difficulty: moderate.
| DIY time | 60 min |
|---|---|
| Shop labour | 1 h |
| Difficulty | Moderate |
| Fitment type | Slip-on (bolt to stock mid-pipe) or full system |
| Materials | Stainless, titanium, carbon-wrapped |
| Weight saving | 2-4 kg slip-on, up to 8 kg full system |
1. Confirm the part fits
Check the part against your exact model year and, where possible, your VIN. Confirm the slip-on matches your link-pipe diameter and lambda sensor bung
2. Prepare the bike
Park on level ground, use paddock stands or a centre stand as required, let the engine cool, and disconnect the battery negative if you are touching wiring.
3. Remove the old part
Work in the reverse of assembly order, bagging and labelling fasteners. Expect around 24 minutes here on a moderate job.
4. Fit the new part
Fitment type: Slip-on (bolt to stock mid-pipe) or full system. Fit dry unless the manual calls for grease or thread-lock, and start every fastener by hand.
5. Torque and verify
Torque every fastener to the manual value with a calibrated wrench. Never guess on brake, axle, or engine-mount hardware.
6. Test and re-check
Do a stationary function check, then a slow test ride. Re-check fasteners and settings after the first 100 km.
Usually no for a road slip-on with a db killer. A full system removing the catalytic converter almost always needs a fuelling module.